Replacement of 2 x diesel of BS5306 standard replacing with modern equivalent LPS1239 standard producing a duty of 6500 Lpm @7.8 bar

  • Replacement engines to LPCB 2024 regulations,
  • Replacement diesel controllers to LPCB 2024 regulations
  • Replacement pumps to LPCB 2024 regulations
  • Replacement Nicad batteries as existing batteries are beyond their life expectancy.
  • New exhaust systems
  • New wiring looms
  • Electric motor removed for full rewind and bearing replacement and new LPCB pump fitted

Just wanted to pass on my thanks to MB Firepumps for completing the install and for the training. The work was done safely and as per the RAMS. Stuart and Davie were excellent throughout, good housekeeping and all the equipment used was of the quality expected by Diageo.
Communication from yourself was excellent all the way through the project also.

Thanks again and I won’t hesitate to use MB Pumps or recommend them in the future.

Ron Polson BSC CMIHT
Project Engineer, CamLe CapEx Team

Back to projects